Skip to main content
JOINA
Likely joinery requirementEarly project signalDocuments available

Approved dual occupancy with secondary dwellings — Bankstown

Two-storey dual occupancy incorporating two secondary dwellings, supported by detailed public plans.

Opportunity summary

Multiple dwelling interiors create repeatable cabinetry scope while remaining below major-project scale.

Stage
Court-approved 5 May 2026; builder not identified · Early project signal
Cabinetry scope
Up to four kitchens, vanities, laundries, wardrobes and storage
What is confirmed
  • DA-1106/2025 was approved on 5 May 2026.
  • The description includes an attached dual occupancy and two secondary dwellings.
  • Architectural drawings and finishes documentation are available.
JOINA assessment
  • The secondary dwellings materially increase likely kitchen and storage quantities.
  • Procurement may already be progressing because approval is five months old.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has construction commenced?
  • Which builder is delivering the project?

Evidence

Approval

Decision approved; determination date 05/05/2026.

NSW Planning Portal · checked 4 Oct 2026
Scope

Dual occupancy and two secondary dwellings with subdivision.

NSW Planning Portal · checked 4 Oct 2026
Documents

Architectural drawings and finishes schedule are listed.

NSW Planning Portal · checked 4 Oct 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: NSW Government Planning