Opportunity summary
The extensive internal reconfiguration creates a plausible bespoke joinery requirement.
- Stage
- Under construction · Early project signal
- Cabinetry scope
- Reconfigured kitchen, laundry, vanities, wardrobes, study and custom waterfront-home built-ins.
- The project is under construction in 2026.
- It transforms an existing two-storey brick residence.
- A new upper level and roof terrace are included.
- The internal layout is substantially reconfigured.
- Shinwoo Architects designed the project.
- Jonathan Kim is listed as nominated architect.
- Substantial internal replanning should generate custom cabinetry work.
- The architect may identify the appointed builder through a professional enquiry.
These are reasoned inferences, not statements from the issuing organisation.
- Who is the appointed builder?
- Has cabinetry procurement commenced?
- What is the completion programme?
- Is the architect authorised to discuss trade contacts?
Evidence
StatusBlakehurst residence is under construction in 2026.
Shinwoo Architects · checked 20 Sept 2026
ScopeMajor additions include an upper level and internal reconfiguration.
Shinwoo Architects · checked 20 Sept 2026
Joinery relevanceExtensive replanning commonly requires new kitchen, robe and vanity cabinetry.
Shinwoo Architects · checked 20 Sept 2026
BuilderThe project page does not identify a construction contractor.
Shinwoo Architects · checked 20 Sept 2026