Skip to main content
JOINA
Likely joinery requirementEarly project signal

Five premium apartments, Coogee (DA/730/2026)

Boutique five-apartment proposal from an established developer with its own construction company.

Opportunity summary

Five three-bedroom apartments align with a capable small-medium or medium joiner, and the applicant has an integrated construction business.

Stage
Exhibition closed 2026-08-14; assessment outcome not verified · Early project signal
Cabinetry scope
Five kitchens, laundries, vanities, wardrobes and premium apartment built-ins.
What is confirmed
  • DA/730/2026 proposes five three-bedroom apartments over five storeys.
  • Two basement parking levels and landscaping are included.
  • Zonie Property Group is the applicant and publicly states it has its own building company.
JOINA assessment
  • Integrated development and construction capability may provide a direct future supplier route.
  • Three-bedroom apartments are likely to carry substantial repeat joinery.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has Zonie committed its construction arm to this project?
  • What is the determination timetable?
  • Does Zonie maintain an incumbent joinery supplier?

Evidence

Scale

Five-storey building with five three-bedroom apartments and two basement levels.

Randwick City Council · checked 19 Aug 2026
Applicant

Applicant: Zonie Property Group.

Randwick City Council · checked 19 Aug 2026
Construction capability

Zonie states that it has its own building company, Zonie Constructions + Design Pty Ltd.

Zonie Property Group · checked 19 Aug 2026
Supplier route

An integrated developer-builder may control future trade-package and supplier decisions.

Analyst inference from company capability · checked 19 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Randwick City Council