Freshie mixed-use development

Approved 30-apartment Northern Beaches project scheduled to start construction in May 2027.

Opportunity summary

Defined 30-dwelling scale, premium coastal location and a long pre-construction runway suit a medium-to-large residential joiner.

Stage
Development consent granted; construction forecast May 2027 · Early project signal
Cabinetry scope
Thirty kitchens, vanities, wardrobes, laundries, apartment storage and retail joinery.
What is confirmed
  • Consent was granted in July 2026.
  • The scheme contains 30 apartments above ground-floor retail.
  • Six apartments are designated affordable housing.
  • CHROFI is the architect.
  • Construction is forecast from May 2027 to December 2028.
  • Planning reference is DA/2025/0077.
JOINA assessment
  • Residential joinery will form a material future trade package.
  • Package planning may occur during design and construction-certificate work.
  • A medium-large joiner is more likely to suit the full package.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Who will be appointed head contractor?
  • Will joinery be one package or split by scope?
  • When will construction-certificate documentation be issued?

Evidence

Approval and scale

MD Living reports consent for 30 apartments, retail space and basement parking.

MD Living · checked 20 Aug 2026
Programme

Construction is forecast for May 2027 through December 2028.

MD Living · checked 20 Aug 2026
Planning reference

The court outcome records consent for DA/2025/0077 and 30 apartments.

DAPlanner court record · checked 20 Aug 2026
Postcode

The AEC locality register lists Freshwater as NSW 2096.

Australian Electoral Commission · checked 20 Aug 2026
Likely package

Thirty apartments imply repeated kitchen, vanity, wardrobe and storage packages.

MD Living · checked 20 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: MD Living