Skip to main content
JOINA
Direct joinery mentionUpcoming packageDocuments availableBuilder appointed

Goodman SYD01 Artarmon — Joinery Work Package

ICN displays a project-specific D&C joinery package for A.W. Edwards' Artarmon data centre project, but publicly masks the deadline.

Opportunity summary

Direct, detailed joinery scope with a legitimate ICN route and appointed builder; best suited to a medium or larger joiner with D&C and BIM capability.

Stage
Under construction; subcontract EOI/registration stage · Upcoming package
Cabinetry scope
Cupboards, vanities, countertops, shelving, office and breakout joinery, banquettes and island benches.
What is confirmed
  • Goodman SYD01 is under construction at 2 Lanceley Place, Artarmon.
  • Goodman's project page confirms postcode 2064.
  • A.W. Edwards is identified as the project builder on ICN.
  • ICN displays a dedicated Joinery work package.
  • Scope includes design, manufacture, supply and installation.
  • The public ICN page labels the Joinery package Open but masks dates.
JOINA assessment
  • The package is substantial and compliance-heavy.
  • A medium-large joiner is more realistic than a small workshop.
  • Immediate deadline verification is warranted.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • What is the EOI closing date?
  • Is the package still accepting submissions at login?
  • What insurance, BIM and security requirements apply?
  • What is the joinery subcontract value?

Evidence

Project and builder

ICN identifies A.W. Edwards and the 2 Lanceley Place Artarmon project.

Gateway by ICN · checked 22 Aug 2026
Joinery package

A dedicated Joinery package is displayed with public status marked Open.

Gateway by ICN · checked 22 Aug 2026
Direct scope

Scope covers D&C, shop documentation, manufacture, supply, installation and handover.

Gateway by ICN · checked 22 Aug 2026
Joinery elements

Listed elements include cupboards, vanities, shelving, banquettes and island benches.

Gateway by ICN · checked 22 Aug 2026
Postcode and construction

Goodman confirms SYD01 is under construction at Artarmon NSW 2064.

Goodman · checked 22 Aug 2026
Deadline

ICN masks the EOI opening and closing dates on the public view.

Gateway by ICN · checked 22 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Gateway by ICN; project information supplied by A.W. Edwards Pty Ltd.