Skip to main content
JOINA
Likely joinery requirementEarly project signalBuilder appointed

Leaf Build — Bondi Tier 1 residential pipeline

An upcoming two-home Bondi Beach duplex follows an active North Bondi custom build using early trade procurement and premium materials.

Opportunity summary

Two closely timed Tier 1 projects under one small integrated builder create a realistic relationship opportunity for a specialist joiner.

Stage
One custom home under construction; duplex coming soon · Early project signal
Cabinetry scope
Two premium kitchens, pantries, vanities, wardrobes, laundries, studies and entertainment cabinetry, plus current-home fit-out.
What is confirmed
  • 109 Francis Street is an upcoming two-home duplex.
  • Leaf Build controls design, construction and project management in-house.
  • 39 Reina Street is under construction in North Bondi.
  • The live project emphasises premium materials and early trade procurement.
  • The North Bondi home is expected to complete in April 2027.
JOINA assessment
  • The upcoming duplex may provide the cleaner entry point if the live project's joinery is already committed.
  • A successful package could position a joiner for repeat Eastern Suburbs work.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • What is the approval status of 109 Francis Street?
  • Has joinery been selected for 39 Reina Street?
  • When will the duplex construction programme be released?
  • Does Leaf maintain a formal supplier onboarding process?

Evidence

Upcoming duplex

109 Francis Street is identified as a coming-soon premium duplex development.

Leaf Build · checked 28 Aug 2026
Integrated delivery

Leaf states design, construction and management will run in-house through handover.

Leaf Build · checked 28 Aug 2026
Live project

39 Reina Street is under construction with completion expected in April 2027.

Leaf Build · checked 28 Aug 2026
Procurement approach

The live project emphasises premium material selection and early trade procurement.

Leaf Build · checked 28 Aug 2026
Joinery status

The page does not identify the joinery contractor or package status.

Leaf Build · checked 28 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Leaf Build Pty Ltd