Moruben Road Mosman residences

Thirty-apartment luxury proposal by boutique developer-builder Made Property.

Opportunity summary

Exactly 30 residences, a premium Mosman market and a developer with internal building capability create strong joinery potential.

Stage
DA lodged in June 2026; determination not verified · Early project signal
Cabinetry scope
High-spec kitchens, vanities, wardrobes, laundries, studies, bars and apartment storage.
What is confirmed
  • Proposal comprises 30 apartments.
  • Twenty-two apartments have three bedrooms.
  • Seven apartments would be affordable housing.
  • Luigi Rosselli Architects designed the scheme.
  • Estimated construction work is $61.5 million.
  • Made describes itself as a boutique development and building firm.
JOINA assessment
  • The three-bedroom-heavy mix should produce substantial cabinetry per dwelling.
  • Made's building capability could provide a direct pre-construction route.
  • Premium views and location suggest above-standard material and detailing requirements.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • What is the council DA reference?
  • Will Made self-deliver construction?
  • When is determination expected?
  • Has joinery design development commenced?

Evidence

Scale

The lodged proposal comprises 30 apartments, predominantly three-bedroom homes.

The Urban Developer · checked 22 Aug 2026
Value

Estimated construction work is reported at $61.5 million.

The Urban Developer · checked 22 Aug 2026
Developer capability

Made identifies itself as a boutique development and building firm producing luxury apartments.

Made Property · checked 22 Aug 2026
Joinery intensity

The luxury positioning and three-bedroom mix indicate substantial kitchen and built-in requirements.

The Urban Developer · checked 22 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: The Urban Developer