Skip to main content
JOINA
Likely joinery requirementUpcoming packageDocuments availableBuilder appointed

Portella at The Waterfront Shell Cove

RCC has mobilised on an 88-apartment coastal project, with excavation and shoring commencing.

Opportunity summary

Early-stage, design-focused coastal apartments with RCC appointed; best suited to an established medium-large residential joiner.

Stage
Early construction and bulk excavation · Upcoming package
Cabinetry scope
Apartment kitchens, walk-through wardrobes, vanities, laundries and rooftop amenity joinery.
What is confirmed
  • Portella comprises 88 apartments.
  • Richard Crookes Constructions is the appointed builder.
  • RCC was established on site by July 2026.
  • Bulk excavation and temporary shoring had commenced.
  • Plus Studio Architects designed the project.
  • Frasers Property targets completion in 2028.
JOINA assessment
  • Vertical and interior packages may still be under planning during early excavation.
  • The mix of one-, two- and three-bedroom apartments creates a sizeable repeatable cabinetry package.
  • RCC's established supplier pool may make relevant references and capacity important.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has RCC released interior trade packages?
  • Is joinery one project-wide package or divided by building?
  • What prequalification platform does the project team use?
  • Has a preferred joiner already been shortlisted?

Evidence

Current stage

Portella construction has commenced.

Frasers Property · checked 17 Aug 2026
Builder

Richard Crookes Constructions was appointed to deliver Portella.

Frasers Property · checked 17 Aug 2026
Scale and value

The annual report lists 88 units and estimated GDV of $102.6 million.

Frasers Property Limited · checked 17 Aug 2026
Architect

Designed by Plus Studio Architects.

Frasers Property · checked 17 Aug 2026
Planning documents

The determination identifies Shell Cove 2529 and approved architectural plans.

Shellharbour City Council · checked 17 Aug 2026
Joinery timing

Excavation-stage progress suggests interior procurement may remain actionable, subject to direct confirmation.

Frasers Property · checked 17 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Frasers Property Australia