The Pendry — Miranda

Duffy Kennedy's 28-residence project is under construction, with premium kitchens and wardrobes specified.

Opportunity summary

The 28-apartment scale and local builder-developer are compatible with a capable medium joiner or staged subcontract package.

Stage
Under construction; early structural work reported in July 2026 · Upcoming package
Cabinetry scope
Kitchens, stone-integrated cabinetry, mirrored wardrobes, vanities, laundries and common-area cabinetry.
What is confirmed
  • The project is at 2-4 Urunga Parade, Miranda.
  • Public project data identifies 28 residences.
  • Duffy Kennedy is the developer and construction company.
  • MHN Design Union is the architect.
  • Mia Lake Interiors designed the interiors.
  • Marketing material confirms construction is underway.
JOINA assessment
  • July structural progress suggests cabinetry coordination may still be active.
  • Premium two and three-bedroom layouts imply repeatable but high-finish joinery.
  • A local supplier relationship may be valuable beyond this single project.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has the joinery subcontract been awarded?
  • Is the package supply-only or supply-and-install?
  • Does Duffy Kennedy maintain a subcontractor registration process?
  • What is the confirmed construction program?

Evidence

Project team

Ray White identifies Duffy Kennedy, MHN Design Union and Mia Lake Interiors.

Ray White · checked 4 Sept 2026
Construction status

Current sales material states construction is underway.

realestate.com.au project listing · checked 4 Sept 2026
Joinery indicators

Residences include detailed kitchens and mirrored built-in wardrobes.

realestate.com.au project listing · checked 4 Sept 2026
Scale

Project data lists 28 residences in an eight-storey building.

Urban.com.au · checked 4 Sept 2026
Structural progress

A steel subcontractor reported ground-floor reinforcement activity in July 2026.

Sydney Steel Reinforcement public update · checked 4 Sept 2026
Procurement timing

Early structural activity suggests fit-out packages may remain under coordination.

realestate.com.au project listing · checked 4 Sept 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Ray White