Opportunity summary
Only 13 large, high-spec residences; package scale may suit an experienced small-medium architectural joiner.
- Stage
- Demolition undertaken; construction scheduled from mid-2026 · Upcoming package
- Cabinetry scope
- Premium kitchens, sculleries, vanities, wardrobes, laundries and penthouse joinery.
- 13 high-end residences are planned.
- Dilcara is the appointed construction partner.
- Third.i Group and NPACT are the developers.
- Woods Bagot designed the project.
- Demolition was underway in April 2026.
- Construction was scheduled to begin mid-2026.
- Apartment size and premium positioning imply substantial bespoke cabinetry.
- Early construction may leave some fit-out packages under procurement.
- Dilcara is the most relevant initial procurement route.
These are reasoned inferences, not statements from the issuing organisation.
- Has the joinery package been tendered or awarded?
- Will cabinetry be one package or split by scope?
- What prequalification does Dilcara require?
Evidence
Scale and location13 high-end residences at 51–57 Bayswater Road, Rushcutters Bay.
Third.i Group · checked 31 Aug 2026
BuilderDilcara appointed as construction partner.
Third.i Group · checked 31 Aug 2026
TimingDemolition underway and construction slated for mid-2026.
Build Australia · checked 31 Aug 2026
Joinery intensityLarge three-bedroom residences and a full-floor penthouse support extensive cabinetry scope.
Build Australia · checked 31 Aug 2026