Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

Arden Broadbeach luxury residences

Twenty-five full-floor luxury residences with Paynter Dixon appointed and construction scheduled to commence in late 2026.

Opportunity summary

The project combines only 25 high-value residences with full-floor layouts and bespoke finishes, while construction is still upcoming.

Stage
Builder appointed; pre-construction · Upcoming package
Cabinetry scope
Premium kitchens, integrated appliance cabinetry, vanities, wardrobes, bars, wine storage and common-area joinery.
What is confirmed
  • Paynter Dixon is appointed to construct the project.
  • Construction is scheduled for late 2026.
  • The address is 152 Surf Parade, Broadbeach 4218.
  • Current marketing identifies 25 residences.
  • Residences include full-floor apartments and duplex penthouses.
  • Premium kitchens and bespoke finishes are specified.
JOINA assessment
  • Joinery packages may be approaching trade pricing or procurement.
  • The low dwelling count and premium specification favour specialist quality over volume production.
  • A medium or larger architectural joiner is the likely fit.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Joinery tender status is not published.
  • Paynter Dixon's package contact is not identified publicly.
  • Final approved dwelling count should be confirmed with the builder.

Evidence

Builder and timing

Paynter Dixon will deliver Arden, with construction planned for late 2026.

Paynter Dixon · checked 15 Aug 2026
Project address

The official builder page identifies 152 Surf Parade, Broadbeach 4218.

Paynter Dixon · checked 15 Aug 2026
Residential scale

Current project marketing identifies 25 luxury residences.

Apartments.com.au · checked 15 Aug 2026
Premium interiors

Specifications include entertainer kitchens, integrated appliances and bespoke finishes.

Arden Broadbeach · checked 15 Aug 2026
Procurement timing

Late-2026 commencement suggests interior trade procurement may still be actionable.

Paynter Dixon · checked 15 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Paynter Dixon