Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

Arden premium residences, Broadbeach

Paynter Dixon is preparing to construct 25 large-format luxury residences from late 2026.

Opportunity summary

Only 25 exceptionally large residences, with premium kitchens and bespoke finishes, create a concentrated high-value package.

Stage
Builder appointed; construction planned for late 2026 · Upcoming package
Cabinetry scope
Premium kitchens, pantries, vanities, wardrobes, laundries, entertainment joinery and common-area cabinetry.
What is confirmed
  • Paynter Dixon is delivering the project.
  • Construction is scheduled to commence in late 2026.
  • The address is 152 Surf Parade, Broadbeach 4218.
  • The scheme has 22 full-floor residences, two sub-penthouses and one penthouse.
  • The project page specifies premium kitchen appliances and bespoke finishes.
JOINA assessment
  • Detailed apartment joinery packages may be programmed during pre-construction.
  • The large residences should require substantially more cabinetry than standard apartments.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has the joinery package been scoped or tendered?
  • Will Paynter Dixon procure one package or split kitchens and wardrobes?
  • Are local subcontractor prequalification requirements open?

Evidence

Delivery team

Paynter Dixon states it is delivering Arden for NBFI Invest.

Paynter Dixon · checked 25 Aug 2026
Timing

Construction to commence late 2026.

Paynter Dixon · checked 25 Aug 2026
Residential scale

22 full-floor residences, two sub-penthouses and one penthouse.

Paynter Dixon · checked 25 Aug 2026
Interior quality

Premium kitchen appliances and bespoke finishes are listed.

Paynter Dixon · checked 25 Aug 2026
Likely package

Large luxury residences imply substantial kitchens, wardrobes and vanity cabinetry.

Paynter Dixon · checked 25 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Paynter Dixon