Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

Arden premium residential tower

Paynter Dixon is appointed to deliver a $150 million, 33-storey premium Broadbeach tower, with construction scheduled for late 2026.

Opportunity summary

High-spec residential interiors, appointed builder and pre-start timing create a credible procurement window for a commercially capable joiner.

Stage
Builder appointed; pre-construction; start scheduled late 2026 · Upcoming package
Cabinetry scope
Apartment kitchens, vanities, wardrobes, laundries, storage and common-area joinery.
What is confirmed
  • Paynter Dixon is the appointed builder.
  • Construction is scheduled to commence late 2026.
  • The project is a 33-storey premium apartment tower.
  • Published project value is $150 million.
  • The builder invites connections with Queensland subcontractors.
JOINA assessment
  • Interior trade procurement may be active or approaching.
  • The volume likely requires medium-large or large-commercial capacity.
  • Premium positioning should support substantial bespoke and veneer work.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has the joinery package been tendered or let?
  • Will cabinetry be split by tower, level or joinery type?
  • What prequalification is required for Queensland subcontractors?

Evidence

Timing

Construction to commence late 2026.

Paynter Dixon — Arden · checked 17 Aug 2026
Builder

Paynter Dixon is proud to be delivering Arden.

Paynter Dixon — Arden · checked 17 Aug 2026
Scale and value

33 storeys; $150 million residential tower.

Paynter Dixon Queensland · checked 17 Aug 2026
Trade route

Seeking to connect with local subcontractors.

Paynter Dixon Queensland · checked 17 Aug 2026
Joinery potential

Premium apartments and bespoke finishes indicate extensive interior packages.

Paynter Dixon — Arden · checked 17 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Paynter Dixon