Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

Crescent Palm Beach

Approved luxury waterfront apartments with SNBX appointed and construction indicated for later 2026.

Opportunity summary

High-spec interiors, appointed builder and a construction start still ahead create a credible medium-sized fit-out lead.

Stage
DA approved; pre-construction; builder appointed · Upcoming package
Cabinetry scope
Apartment kitchens, vanities, wardrobes, laundries and extensive amenity joinery.
What is confirmed
  • Waterfront project at 34-36 Murlong Crescent.
  • Development approval has been granted.
  • SNBX Constructions is identified as appointed builder.
  • Construction is indicated to commence later in 2026.
  • Estimated completion is late 2028.
  • Current sources differ between 37 and 39 residences.
JOINA assessment
  • Joinery procurement may be approaching during pre-construction.
  • Natural stone and timber interior specifications imply substantial cabinetry coordination.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has the joinery package been scoped or awarded?
  • Is the final dwelling count 37 or 39?
  • Who manages SNBX subcontractor procurement?

Evidence

Address and status

Current project material identifies the Palm Beach waterfront development as now selling.

Crescent Palm Beach · checked 3 Sept 2026
Builder and timing

SNBX is appointed, with construction indicated for later 2026 and completion in late 2028.

Apartments.com.au · checked 3 Sept 2026
Approval and design team

Approval was reported in April 2026; DCS and BYculprit form the development team.

Apartments.com.au · checked 3 Sept 2026
Residence count

Current listing reports 39 residences while earlier project media reported 37.

Ocean Road Magazine · checked 3 Sept 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.