Opportunity summary
The development includes eight townhomes and spacious owner-occupier apartments, with construction only recently underway under an integrated local builder.
- Stage
- Early construction · Upcoming package
- Cabinetry scope
- Seventy-six kitchens, vanities, wardrobes and laundries plus study/MPR cabinetry and shared amenity fit-out.
- Sixty-eight apartments and eight townhomes.
- Pradella is both developer and builder.
- Rothelowman designed the project.
- Full construction was scheduled from July 2026.
- Site is 18 Egmont Street, Sherwood.
- Completion is expected from late 2027.
- Early structural works may leave interior packages unallocated.
- Townhome joinery could form a manageable separate package.
These are reasoned inferences, not statements from the issuing organisation.
- Has Pradella appointed cabinetry suppliers?
- Are apartments and townhomes procured separately?
- Does Pradella accept new trade registrations?
Evidence
Delivery modelAs both Developer and Builder, Pradella maintains end-to-end control.
Evergreen Sherwood · checked 29 Aug 2026
Residential mixArchitecturally designed apartments and townhomes.
Evergreen Sherwood · checked 29 Aug 2026
Yield68 apartments plus 8 townhomes.
Brisbane Development · checked 29 Aug 2026
Construction timingFull construction due to begin in July 2026.
Brisbane Development · checked 29 Aug 2026
Planning recordA006379381; Material Change of Use; Pradella Developments.
Brisbane City Council Development.i · checked 29 Aug 2026
Package potentialThe townhome component may support a distinct small-medium residential joinery package.
JOINA analysis from project mix · checked 29 Aug 2026