Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

Kin by Azure, Southport

Approved 114-residence terrace community scheduled for construction by Azure Build from Q4 2026.

Opportunity summary

Near-term residential volume with an appointed in-house builder and an explicit public subcontractor/supplier pathway.

Stage
DA approved; market launch underway; construction indicated for Q4 2026 · Upcoming package
Cabinetry scope
Repeated kitchens, vanities, wardrobes, laundries and communal amenity cabinetry across 114 residences.
What is confirmed
  • Azure secured development approval for 114 residences.
  • The site is 1.7 hectares within Lumina Gold Coast.
  • The mix includes terraces and apartment-style residences.
  • Azure identified Q4 2026 as the intended construction start.
  • Azure Build is the nominated in-house construction arm.
  • Azure Build publicly seeks subcontractors and suppliers.
JOINA assessment
  • Cabinetry volume should be material across 114 dwellings.
  • Packages may suit established medium or medium-large joiners.
  • Azure's wider pipeline could support a repeat supplier relationship.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has Kin's joinery package been scoped or tendered?
  • What prequalification is required by Azure Build?
  • Will cabinetry be divided by stage or dwelling type?

Evidence

Approval and scale

Development Approval secured... this community will deliver 114 residences across a 1.7-hectare site.

Azure Group · checked 30 Aug 2026
Construction timing

Construction scheduled to commence in Q4 2026, delivered by our in-house construction arm, Azure Build.

Azure Group · checked 30 Aug 2026
Housing mix

Three-bedroom terrace homes... one- and two-bedroom apartment-style residences... two and three-storey configurations.

Azure Group · checked 30 Aug 2026
Supplier route

We're always seeking trusted subcontractors and suppliers to join our network.

Azure Build · checked 30 Aug 2026
Joinery volume

Each Azure project delivers at scale, with an average of over 100 dwellings per development.

Azure Build · checked 30 Aug 2026
Procurement status

Upcoming opportunities... express your interest in partnering with us on our next wave of projects.

Azure Build · checked 30 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Azure Group