Skip to main content
JOINA
Likely joinery requirementEarly project signal

KIN Southport — 114 terrace residences

Approved townhouse community scheduled to commence construction in November 2026.

Opportunity summary

Large repeat package with a current project page and immediate construction timing.

Stage
Planning immediately before scheduled construction · Early project signal
Cabinetry scope
High-volume kitchens, vanities, wardrobes and laundries across multiple dwelling types.
What is confirmed
  • The project contains 114 residences.
  • Construction is scheduled from November 2026 to July 2028.
  • JN Group identifies the project as current.
  • Azure is the project developer.
  • Plus Studio designed the approved scheme.
  • Approximate total development cost is $90.9 million.
JOINA assessment
  • Cabinetry may be divided into stages or dwelling-type packages.
  • Only larger joiners are likely to satisfy programme and volume requirements.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Who is the head contractor?
  • Has the joinery package been tendered?
  • Will procurement be staged?

Evidence

Scale

JN Group states the project contains 114 residences.

JN Group · checked 3 Nov 2026
Programme

Construction is scheduled from November 2026 to July 2028.

JN Group · checked 3 Nov 2026
Value

Approximate total development cost is stated as $90.9 million.

JN Group · checked 3 Nov 2026
Approval team

Published approval coverage identifies Azure and Plus Studio.

Apartments.com.au · checked 3 Nov 2026
Packaging

The scale is likely to require staged or high-volume cabinetry delivery.

JOINA analyst inference · checked 3 Nov 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: JN Group