Opportunity summary
Large repeat package with a current project page and immediate construction timing.
- Stage
- Planning immediately before scheduled construction · Early project signal
- Cabinetry scope
- High-volume kitchens, vanities, wardrobes and laundries across multiple dwelling types.
- The project contains 114 residences.
- Construction is scheduled from November 2026 to July 2028.
- JN Group identifies the project as current.
- Azure is the project developer.
- Plus Studio designed the approved scheme.
- Approximate total development cost is $90.9 million.
- Cabinetry may be divided into stages or dwelling-type packages.
- Only larger joiners are likely to satisfy programme and volume requirements.
These are reasoned inferences, not statements from the issuing organisation.
- Who is the head contractor?
- Has the joinery package been tendered?
- Will procurement be staged?
Evidence
ScaleJN Group states the project contains 114 residences.
JN Group · checked 3 Nov 2026
ProgrammeConstruction is scheduled from November 2026 to July 2028.
JN Group · checked 3 Nov 2026
ValueApproximate total development cost is stated as $90.9 million.
JN Group · checked 3 Nov 2026
Approval teamPublished approval coverage identifies Azure and Plus Studio.
Apartments.com.au · checked 3 Nov 2026
PackagingThe scale is likely to require staged or high-volume cabinetry delivery.
JOINA analyst inference · checked 3 Nov 2026