Opportunity summary
Only 37 large residences, early structural progress and an explicit builder tender channel create a credible medium-sized subcontract opportunity.
- Stage
- Under construction; raft slab completed July 2026 · Upcoming package
- Cabinetry scope
- Premium kitchens, vanities, wardrobes, laundries, bars, dining-room and wellness-area joinery.
- Lumara contains 37 three and four-bedroom residences across 26 levels.
- 5Point is both builder and developer under a design-and-construct model.
- Construction commenced in December 2025.
- The raft slab milestone was completed by July 2026.
- The project includes private dining, business lounge, bar and wellness spaces.
- 5Point publishes an EstimateOne tender-submission route.
- Vertical construction timing may precede final joinery manufacture and installation.
- Large apartments and shared amenities should create substantial architectural cabinetry scope.
- A successful approach could open access to 5Point's wider Queensland pipeline.
These are reasoned inferences, not statements from the issuing organisation.
- Is Lumara currently visible in 5Point's EstimateOne workspace?
- Have apartment and common-area joinery packages been awarded?
- Are packages separated by tower area or joinery type?
- What prequalification is required?
Evidence
Project scaleThe official page states 37 residences across 26 levels.
5Point Projects · checked 31 Aug 2026
Delivery modelLumara is a 5Point design-and-construct project built and developed by 5Point.
5Point Projects · checked 31 Aug 2026
StartConstruction commenced in December 2025.
5Point Projects · checked 31 Aug 2026
Current progress5Point reported completion of the raft slab on 7 July 2026.
5Point Projects · checked 31 Aug 2026
Tender routeThe public contact page links a 5Point Tender Submission route through EstimateOne.
5Point Projects · checked 31 Aug 2026
Likely scopeLarge residences plus dining, bar and wellness areas indicate extensive cabinetry.
5Point Projects · checked 31 Aug 2026