MYST Burleigh Heads

Early structural-stage beachfront project comprising 34 large luxury residences.

Opportunity summary

Only slightly above Tier 2 scale, with high-value residences and August 2026 basement-stage evidence.

Stage
Basement excavation and early structural works · Upcoming package
Cabinetry scope
Premium kitchens, butlers pantries, vanities, wardrobes, laundries and shared-area joinery.
What is confirmed
  • The project contains 34 residences.
  • Construction is underway.
  • Basement Level 1 was poured by August 2026.
  • Excavation was progressing to lower basements.
  • Completion is estimated for late 2027.
  • Frank Developments is the developer.
JOINA assessment
  • Cabinetry procurement may follow structural coordination.
  • Large residences imply substantial joinery per dwelling.
  • The package may suit a medium-large specialist.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Who is the head contractor?
  • Has joinery design been documented?
  • Has cabinetry procurement commenced?

Evidence

Scale

The listing records 34 apartments.

realestate.com.au · checked 8 Sept 2026
August status

Basement Level 1 was poured and deeper excavation was commencing.

realestate.com.au · checked 8 Sept 2026
Program

Construction is underway with late-2027 completion indicated.

realestate.com.au · checked 8 Sept 2026
Package timing

Basement-stage progress suggests fit-out packages may still be actionable.

realestate.com.au · checked 8 Sept 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.