Skip to main content
JOINA
Direct joinery mentionUpcoming packageBuilder appointed

MYST North Burleigh — beachfront residences

Early-construction luxury project with explicit light-oak joinery and scullery references, built directly by Frank Developments.

Opportunity summary

The project explicitly specifies light-oak joinery and hidden sculleries, while early works reported in March suggest fit-out may remain ahead.

Stage
Under construction; exact August 2026 structural stage not published · Upcoming package
Cabinetry scope
Premium oak kitchens, hidden sculleries, vanities, walk-in wardrobes, bars, laundries and resident amenity joinery.
What is confirmed
  • The current project page describes 34 residences across 18 levels.
  • MYST is under construction with late-2027 completion targeted.
  • Frank Developments is both developer and builder.
  • Published interiors include light-oak joinery.
  • Kitchens include hidden butler's sculleries.
  • March 2026 reporting placed works at basement-retention and excavation preparation.
JOINA assessment
  • Joinery should be high-value, design-sensitive and sample-intensive.
  • The project is best suited to a medium-large architectural joiner.
  • Immediate contact is justified because fit-out procurement may be approaching.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • What is the current structural progress?
  • Has apartment joinery been awarded?
  • Are amenity and residential packages separate?
  • Why do public sources alternate between 32 and 34 residences?

Evidence

Current scale

The current project page records 34 residences across 18 levels.

Frank Developments · checked 18 Aug 2026
Construction status

The project is under construction with late-2027 completion targeted.

Frank Developments · checked 18 Aug 2026
Builder

Published project material identifies Frank Developments as developer and builder.

Frank Developments · checked 18 Aug 2026
Direct joinery

Interior reporting specifies light-oak joinery and hidden butler's sculleries.

Frank Developments · checked 18 Aug 2026
Early works

March reporting placed works at basement retention, dewatering and excavation preparation.

Frank Developments · checked 18 Aug 2026
Timing

Early basement works and a late-2027 completion indicate interior packages may still warrant investigation.

Frank Developments · checked 18 Aug 2026
Dwelling count

The current page states 34 residences while March project reporting stated 32.

Frank Developments · checked 18 Aug 2026
Award status

No reviewed source confirms whether joinery has been awarded.

Frank Developments · checked 18 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Frank Developments project page