Park Row luxury adaptive-reuse residences

Five large luxury residences being built within Brisbane's former US Consulate.

Opportunity summary

Only five residences, but each exceeds typical apartment scale and carries premium timber, stone and appliance specifications.

Stage
Early construction · Upcoming package
Cabinetry scope
Large kitchens, vanities, wardrobes, wine displays, lift-lobby joinery and bespoke built-ins.
What is confirmed
  • Project site is 383 Wickham Street, Spring Hill.
  • Mettle is appointed head contractor and builder.
  • Chapter Two is the developer.
  • Cera Stribley designed the conversion.
  • The project comprises five luxury residences.
  • Completion is expected in 2027.
JOINA assessment
  • Low dwelling count could suit a capable boutique architectural joiner.
  • Whole-floor layouts suggest substantial cabinetry per residence.
  • Early construction may leave time for later interior packages.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has Mettle already let the joinery package?
  • Will cabinetry be one package or residence-specific packages?
  • What prequalification requirements apply?

Evidence

Builder appointment

Mettle's appointment as head contractor and builder for Park Row.

Chapter Two · checked 12 Sept 2026
Construction stage

Construction is under way on Chapter Two's adaptive reuse project.

The Urban Developer · checked 12 Sept 2026
Project scale

A boutique collection of five apartments.

The Urban Developer · checked 12 Sept 2026
Site address

Works on site begin at Park Row, 383 Wickham Street.

Mettle project update · checked 12 Sept 2026
Interior specification

Wine displays, premium appliances and natural stone and timber finishes.

Park Row project announcement · checked 12 Sept 2026
Public business contact

Phone and general Chapter Two email are publicly listed.

Park Row · checked 12 Sept 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Chapter Two