Opportunity summary
Only five residences, but each exceeds typical apartment scale and carries premium timber, stone and appliance specifications.
- Stage
- Early construction · Upcoming package
- Cabinetry scope
- Large kitchens, vanities, wardrobes, wine displays, lift-lobby joinery and bespoke built-ins.
- Project site is 383 Wickham Street, Spring Hill.
- Mettle is appointed head contractor and builder.
- Chapter Two is the developer.
- Cera Stribley designed the conversion.
- The project comprises five luxury residences.
- Completion is expected in 2027.
- Low dwelling count could suit a capable boutique architectural joiner.
- Whole-floor layouts suggest substantial cabinetry per residence.
- Early construction may leave time for later interior packages.
These are reasoned inferences, not statements from the issuing organisation.
- Has Mettle already let the joinery package?
- Will cabinetry be one package or residence-specific packages?
- What prequalification requirements apply?
Evidence
Builder appointmentMettle's appointment as head contractor and builder for Park Row.
Chapter Two · checked 12 Sept 2026
Construction stageConstruction is under way on Chapter Two's adaptive reuse project.
The Urban Developer · checked 12 Sept 2026
Project scaleA boutique collection of five apartments.
The Urban Developer · checked 12 Sept 2026
Site addressWorks on site begin at Park Row, 383 Wickham Street.
Mettle project update · checked 12 Sept 2026
Interior specificationWine displays, premium appliances and natural stone and timber finishes.
Park Row project announcement · checked 12 Sept 2026
Public business contactPhone and general Chapter Two email are publicly listed.