Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

Pescado Palm Beach — seven full-floor luxury residences

Very small, high-value beachfront project with HNKN appointed and construction recently commencing.

Opportunity summary

Seven house-scale residences favour a specialist architectural joiner over a volume supplier.

Stage
Early construction following April 2026 demolition · Upcoming package
Cabinetry scope
Bespoke kitchens, vanities, robes, laundries, entertainment units and wellness-area cabinetry.
What is confirmed
  • Pescado comprises six full-floor apartments and a two-level penthouse.
  • The verified address is 228-230 Jefferson Lane, Palm Beach QLD 4221.
  • HNKN is the appointed builder.
  • BDA Architecture provides architecture and interior design.
  • Demolition finished in April 2026 and current sources describe construction as commenced.
  • Each residence has house-like proportions and private lift access.
JOINA assessment
  • Low dwelling count and premium positioning indicate bespoke rather than repetitive joinery.
  • HNKN's boutique profile may suit direct relationship-based subcontracting.
  • Fit-out procurement could still be active at this early stage.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has HNKN awarded the joinery package?
  • Is cabinetry one package or separated by trade?
  • What is the confirmed construction programme?
  • Does HNKN maintain a preferred joiner list?

Evidence

Address

The official project site identifies 228-230 Jefferson Lane, Palm Beach QLD 4221.

Pescado Palm Beach · checked 31 Aug 2026
Scale

Seven residences comprise six full-floor apartments and a two-level penthouse.

realestate.com.au Project · checked 31 Aug 2026
Builder

Luxury builder HNKN is appointed to the project.

realestate.com.au Project · checked 31 Aug 2026
Design team

BDA lists the project as in progress with architecture and interior-design services.

BDA Architecture · checked 31 Aug 2026
Construction

Demolition completed in April 2026 and construction is described as commenced.

Apartments.com.au · checked 31 Aug 2026
Joiner fit

House-scale layouts and boutique volume favour specialist architectural cabinetry.

realestate.com.au Project · checked 31 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: YLB Property Developments