Opportunity summary
Low-rise repetition across 96 homes offers scalable production work, while staged delivery may allow packages suitable for medium joiners.
- Stage
- Launched August 2026; delivery status not disclosed · Early project signal
- Cabinetry scope
- Repeated townhouse kitchens, vanities, robes, laundries and storage, potentially divided by stage.
- The current project page states 96 two-storey townhouses.
- Three- and four-bedroom layouts are planned.
- Townhouse sizes range from 158 to 186 square metres.
- Stage 1 includes a pool and gym.
- The project launched in August 2026.
- SANDT publishes an email and phone contact.
- The current launch may precede vertical construction and cabinetry procurement.
- Staging could allow manageable joinery package sizes.
- Marketed Bosch-equipped kitchens confirm a defined kitchen specification is developing.
- SANDT's linked AUSTK Construction business may participate in delivery, but this is not confirmed.
These are reasoned inferences, not statements from the issuing organisation.
- Who is the contracted builder?
- Does the current 96-unit scheme supersede the earlier 87-unit approval?
- What is the construction commencement date?
- Will cabinetry be procured centrally or by stage?
Evidence
Current scale96 two-storey townhouses with communal area and swimming pool.
SANDT Developments Group · checked 1 Sept 2026
Launch timingLaunching Aug 2026.
SANDT Developments Group · checked 1 Sept 2026
Dwelling formThree- and four-bedroom layouts ranging from 158m² to 186m².
SANDT Developments Group · checked 1 Sept 2026
Kitchen specificationContemporary kitchens are marketed with Bosch appliances.
SANDT Developments Group · checked 1 Sept 2026
Postcode173 Brays Road, Griffin, QLD 4503.
Realcommercial address record · checked 1 Sept 2026
Approval discrepancyEarlier sale material described approval for 87 townhouses plus manager facilities.
Realcommercial address record · checked 1 Sept 2026