Opportunity summary
Only three high-value homes, substantial bespoke interiors and an identified in-house builder suit a quality-focused small or medium joiner.
- Stage
- DA approved; pre-construction · Upcoming package
- Cabinetry scope
- Bespoke kitchens, bars, vanities, wardrobes, laundries and rooftop entertaining cabinetry.
- Three four-bedroom residences are planned.
- Each home spans three levels with a private lift and rooftop terrace.
- The project is DA approved.
- Studio Snell is the architect.
- Construction is scheduled to start in 2027.
- Bastion Built is identified as the delivery builder.
- Low dwelling count and luxury positioning indicate intensive custom cabinetry per residence.
- Procurement discussions may occur ahead of the planned 2027 start.
- Bastion's integrated model may centralise trade selection.
These are reasoned inferences, not statements from the issuing organisation.
- Has the cabinetry package been documented?
- Does Bastion Built accept new specialist joinery suppliers?
- Will the three homes be procured separately from the Nera tower?
Evidence
Scale and approvalThree architecturally designed four-bedroom homes; project status DA Approved.
Bastion · checked 26 Aug 2026
Design teamStudio Snell is named as architect, with landscaping by Jamie Durie.
Bastion · checked 26 Aug 2026
Construction timingConstruction is scheduled to start in 2027, with delivery by Bastion Built reported.
realestate.com.au · checked 26 Aug 2026
Likely cabinetry intensityLuxury kitchens, rooftop entertaining areas and four-bedroom layouts imply extensive bespoke cabinetry.
Bastion · checked 26 Aug 2026