Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

The Residences at Nera — three luxury homes

DA-approved enclave of three architect-designed homes with a 2027 construction start planned.

Opportunity summary

Only three high-value homes, substantial bespoke interiors and an identified in-house builder suit a quality-focused small or medium joiner.

Stage
DA approved; pre-construction · Upcoming package
Cabinetry scope
Bespoke kitchens, bars, vanities, wardrobes, laundries and rooftop entertaining cabinetry.
What is confirmed
  • Three four-bedroom residences are planned.
  • Each home spans three levels with a private lift and rooftop terrace.
  • The project is DA approved.
  • Studio Snell is the architect.
  • Construction is scheduled to start in 2027.
  • Bastion Built is identified as the delivery builder.
JOINA assessment
  • Low dwelling count and luxury positioning indicate intensive custom cabinetry per residence.
  • Procurement discussions may occur ahead of the planned 2027 start.
  • Bastion's integrated model may centralise trade selection.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has the cabinetry package been documented?
  • Does Bastion Built accept new specialist joinery suppliers?
  • Will the three homes be procured separately from the Nera tower?

Evidence

Scale and approval

Three architecturally designed four-bedroom homes; project status DA Approved.

Bastion · checked 26 Aug 2026
Design team

Studio Snell is named as architect, with landscaping by Jamie Durie.

Bastion · checked 26 Aug 2026
Construction timing

Construction is scheduled to start in 2027, with delivery by Bastion Built reported.

realestate.com.au · checked 26 Aug 2026
Likely cabinetry intensity

Luxury kitchens, rooftop entertaining areas and four-bedroom layouts imply extensive bespoke cabinetry.

Bastion · checked 26 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Bastion Development Group