Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

Derby No.32, Collingwood

Figurehead has been appointed to deliver 32 design-led residences, with construction scheduled to start in September 2026.

Opportunity summary

The builder appointment is recent and construction is only commencing, offering unusually good timing for a 32-residence package.

Stage
Builder appointed; construction scheduled to commence September 2026 · Upcoming package
Cabinetry scope
Apartment kitchens, vanities, wardrobes, laundries, storage, studies and common-area joinery.
What is confirmed
  • The project contains 32 residences.
  • Figurehead is the appointed builder.
  • Construction is scheduled to start in September 2026.
  • Completion is scheduled for June 2028.
  • Warren and Mahoney is the architect.
  • The stated construction cost is $34 million.
JOINA assessment
  • Joinery procurement may follow early trade and structural packages.
  • Detailed interiors indicate a substantial cabinetry allowance.
  • The full package likely favours a medium-large joiner.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has Figurehead issued joinery scopes to its trade list?
  • Will the package be divided by cabinetry type or stage?
  • Are Edwina Glenn interior schedules finalised?

Evidence

Builder and timing

Figurehead is appointed, with construction scheduled to commence in September 2026.

Figurehead Construction · checked 3 Sept 2026
Scale

The Collingwood project comprises 32 architecturally designed residences.

Figurehead Construction · checked 3 Sept 2026
Value and program

Figurehead states a $34 million cost and June 2028 completion.

Figurehead Construction · checked 3 Sept 2026
Design team

Warren and Mahoney designed the architecture; Edwina Glenn designed the interiors.

Figurehead Construction · checked 3 Sept 2026
Joinery scope

Thirty-two premium residences should require repeated kitchen, wardrobe, vanity and storage packages.

Figurehead Construction · checked 3 Sept 2026
Trade release

The public project material does not identify released or awarded joinery packages.

Figurehead Construction · checked 3 Sept 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Figurehead Construction