Opportunity summary
The builder appointment is recent and construction is only commencing, offering unusually good timing for a 32-residence package.
- Stage
- Builder appointed; construction scheduled to commence September 2026 · Upcoming package
- Cabinetry scope
- Apartment kitchens, vanities, wardrobes, laundries, storage, studies and common-area joinery.
- The project contains 32 residences.
- Figurehead is the appointed builder.
- Construction is scheduled to start in September 2026.
- Completion is scheduled for June 2028.
- Warren and Mahoney is the architect.
- The stated construction cost is $34 million.
- Joinery procurement may follow early trade and structural packages.
- Detailed interiors indicate a substantial cabinetry allowance.
- The full package likely favours a medium-large joiner.
These are reasoned inferences, not statements from the issuing organisation.
- Has Figurehead issued joinery scopes to its trade list?
- Will the package be divided by cabinetry type or stage?
- Are Edwina Glenn interior schedules finalised?
Evidence
Builder and timingFigurehead is appointed, with construction scheduled to commence in September 2026.
Figurehead Construction · checked 3 Sept 2026
ScaleThe Collingwood project comprises 32 architecturally designed residences.
Figurehead Construction · checked 3 Sept 2026
Value and programFigurehead states a $34 million cost and June 2028 completion.
Figurehead Construction · checked 3 Sept 2026
Design teamWarren and Mahoney designed the architecture; Edwina Glenn designed the interiors.
Figurehead Construction · checked 3 Sept 2026
Joinery scopeThirty-two premium residences should require repeated kitchen, wardrobe, vanity and storage packages.
Figurehead Construction · checked 3 Sept 2026
Trade releaseThe public project material does not identify released or awarded joinery packages.
Figurehead Construction · checked 3 Sept 2026