Opportunity summary
Large house-like residences, bespoke interiors and a long programme create a substantial high-spec package suited to an experienced architectural joiner.
- Stage
- Early construction; commenced April 2026 · Upcoming package
- Cabinetry scope
- Integrated oak kitchens, butler's pantries, walk-in robes, vanities and bathhouse or residents' amenity joinery.
- Lowe Living commenced construction on 16 April 2026.
- The $160 million project contains 19 residences.
- Residences range from 295 to 606 square metres.
- Purchaser occupation is expected in early 2028.
- Studio Kennon designed the architecture and interiors.
- The specification names integrated oak joinery and concealed butler's pantries.
- Cabinetry quantities and complexity should be high relative to the dwelling count.
- Joinery design coordination may still be active during structural works.
- Amenity areas could provide additional specialist fit-out scope.
These are reasoned inferences, not statements from the issuing organisation.
- Has the joinery package been tendered or awarded?
- Does Lowe Living use a preferred joinery panel?
- Will apartment and amenity joinery be procured separately?
Evidence
Project scale and joineryNineteen residences; kitchens include integrated oak joinery and concealed butler's pantries.
Lowe Living · checked 17 Aug 2026
Construction commencementConstruction officially commenced on 16 April 2026.
Lowe Living · checked 17 Aug 2026
Value and programmeThe project is valued at $160 million with occupation expected in early 2028.
Lowe Living · checked 17 Aug 2026
Procurement timingThe early-construction stage may leave time for detailed joinery coordination.
Lowe Living · checked 17 Aug 2026