Opportunity summary
Only eight residences but each has a dense, premium joinery brief and high-value appliances and finishes.
- Stage
- Under construction; early excavation and structure · Upcoming package
- Cabinetry scope
- Oak kitchens, concealed sculleries, curved joinery, wardrobes, drying closets, vanities, window seats and storage.
- The project comprises eight residences.
- The official site specifies crafted and oak-finished joinery.
- Kitchens include concealed sculleries and integrated Gaggenau appliances.
- Wardrobe lifts, drying closets and extensive storage are specified.
- August 2026 reporting places works at piling, capping beams and ground-floor formwork.
- Estimated completion is November 2027.
- Early structural status may leave time for joinery procurement.
- The penthouse and varied residences may require substantial custom detailing.
- A design-led small-medium joiner could be suitable if the package is not bundled.
These are reasoned inferences, not statements from the issuing organisation.
- Who is the appointed builder?
- Is CAPAX procuring joinery directly or through a head contractor?
- Are shop drawings and stone coordination included?
- Has a prototype kitchen been commissioned?
Evidence
ScaleOfficial site describes an exclusive collection of eight residences.
Wattletree Pavilion · checked 23 Aug 2026
Direct joinery scopeProject material specifies crafted joinery, curved joinery, oak finishes and concealed sculleries.
Wattletree Pavilion · checked 23 Aug 2026
Additional cabinetryStorage, window seating, wardrobe lifts and drying closets are included.
Wattletree Pavilion · checked 23 Aug 2026
Construction stageAugust update reports piling complete and early ground-floor and capping-beam works progressing.
REA project update · checked 23 Aug 2026
DeveloperCAPAX Group is identified as developer.
REA project profile · checked 23 Aug 2026
BuilderNo builder name appears on the official project-team content reviewed.
Wattletree Pavilion · checked 23 Aug 2026