Skip to main content
JOINA
Likely joinery requirementEarly project signal

91-93 Canning Highway terrace development, East Fremantle

A $11.25m proposal for nine two- and three-level terrace houses with basement parking.

Opportunity summary

Small premium terrace project with repeatable cabinetry packages and sufficient value for architectural finishes.

Stage
Application lodged 9 April 2026; determination not verified · Early project signal
Cabinetry scope
Nine kitchens, pantries, vanities, wardrobes, laundries and residential built-ins.
What is confirmed
  • Nine terrace houses are proposed.
  • Two residences are two levels and seven are three levels.
  • Basement parking is included.
  • Declared value is $11.25m.
  • The DAP application was received on 9 April 2026.
JOINA assessment
  • The repeated dwelling typology could suit efficient manufacture and installation.
  • Its East Fremantle location may support a higher finish level.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Has the application been determined?
  • Who are the current developer, architect and builder?
  • Has detailed design started?

Evidence

Application

$11.25m; 9 terrace houses; application received 9 April 2026.

WA Development Assessment Panels · checked 4 Oct 2026
Configuration

Two two-level and seven three-level terrace houses with basement parking.

WA Development Assessment Panels · checked 4 Oct 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Western Australian Planning Commission