Skip to main content
JOINA

Joinery tenders and upcoming projects

Find and win more work with relevant tenders, upcoming packages and early project leads—built for Australian cabinetmakers and joinery businesses.

Get the daily brief by email

82 current opportunities · Page 1 of 2

Worth reviewingPerth, WA

Roe Street build-to-rent, Perth City Link – 174 affordable and social homes (Icon Construction)

DevelopmentWA's 30-storey build-to-rent project on Roe Street has 174 dwellings (139 affordable, 35 social). MJA designed it and Icon Construction is building it. Construction was expected to start in the second half of 2026 and take about 2.5 years.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Build-to-rent affordable/social apartments
Published
29 Nov 2026
Closing
Not stated
Verified
29 Nov 2026

Cabinetry scopeInferred: repeated apartment kitchens, vanities, robes and laundry cabinetry across 174 dwellings, plus possible common-area joinery.

Good matchEast Perth, WA

DAP/26/03120 – 13 Multiple Dwellings, 16 Wickham Street, East Perth

A development application for 13 multiple dwellings (estimated $6m) at 16 (Lot E106) Wickham Street, East Perth, before a Development Assessment Panel. Lodged 8 June 2026, with a panel meeting listed for 1 December 2026.

Likely joinery requirementEarly project signal
Project
Multiple dwellings (13 apartments)
Published
3 Sept 2026
Closing
Not stated
Verified
29 Nov 2026

Cabinetry scopeKitchens, vanities, robes and laundries for 13 apartments (inferred).

Strong matchCottesloe, WA

Côte Residences and Meridian Cottesloe – 15 luxury beachfront apartments (West to West Group)

Two boutique luxury apartment buildings by developer Baltinas in Cottesloe Beach: Meridian Cottesloe (6 storeys, 7 residences) and Côte Residences (7 storeys, 8 residences). West to West Group is building both at the same time, with completion expected Q3 2027.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Boutique luxury apartments (2 buildings, 15 residences)
Published
29 Nov 2026
Closing
Not stated
Verified
29 Nov 2026

Cabinetry scopeInferred, not stated: high-end kitchens, butler's pantries, vanities, walk-in robes, laundries and built-in living joinery across 15 large 3-4 bed residences, including a penthouse and sub-penthouse.

Good matchMosman Park, WA

Mos Lane, 46 Manning Street, Mosman Park – 68 luxury apartments and townhomes (Icon Construction)

ADC's Mos Lane is a boutique-positioned project of 68 luxury apartments and townhouses across Samson House and Manning House, including five townhomes and two customisable penthouses. The team is architect Nelson + Koo, interior designer Hecker Guthrie and builder Icon Construction, with completion expected late 2027.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Luxury apartments and townhomes (68 dwellings)
Published
29 Nov 2026
Closing
Not stated
Verified
29 Nov 2026

Cabinetry scopeInferred: apartment kitchens, vanities, robes and laundries; bespoke joinery for the two customisable penthouses and five townhomes; possibly small retail fit-outs.

Good matchSouth Perth, WA

Medika Residences, 13-13A Stone Street, South Perth – 8 luxury apartments

Griffin Group's $12m nine-storey boutique development of eight apartments on a 981 m² site. By March 2026 the former houses had reportedly been demolished ahead of construction.

Likely joinery requirementEarly project signal
Project
Boutique apartments (8 dwellings)
Published
29 Nov 2026
Closing
Not stated
Verified
29 Nov 2026

Cabinetry scopeInferred: kitchens, vanities, robes, laundries and living built-ins for eight large apartments, which may be close to one per floor.

Strong matchMenora, WA

Ten independent-living dwellings — Menora

A $4.85m addition to an existing retirement complex reached DAP consideration on 10 November 2026.

Likely joinery requirementEarly project signal
Project
Retirement complex extension
Published
3 Sept 2026
Closing
Not stated
Verified
21 Nov 2026

Cabinetry scopeTen kitchens, accessible vanities, wardrobes, laundries and common-area cabinetry.

Strong matchJolimont, WA

27 townhouses — Jolimont

A $16m proposal for 27 three-storey townhouses reached a DAP meeting on 17 November 2026.

Likely joinery requirementEarly project signal
Project
Grouped townhouse development
Published
1 Sept 2026
Closing
Not stated
Verified
21 Nov 2026

Cabinetry scopeTwenty-seven kitchens, vanities, wardrobes, laundries and optional built-ins.

Strong matchPerth, WA

Six grouped dwellings — Perth

A $3.6m six-dwelling project entered the DAP register in August 2026.

Likely joinery requirementEarly project signal
Project
Six grouped dwellings
Published
3 Sept 2026
Closing
Not stated
Verified
21 Nov 2026

Cabinetry scopeSix kitchens, vanities, wardrobes, laundries and residential built-ins.

Strong matchBassendean, WA

1 Park Lane — 73 affordable and social apartments

PACT Construction is appointed to a nine-storey Bassendean development expected to commence in late 2026.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Affordable and social apartments
Published
8 Nov 2026
Closing
Not stated
Verified
8 Nov 2026

Cabinetry scopeApartment kitchens, vanities, wardrobes, laundries and communal-area joinery.

Strong matchRivervale, WA

Parkside Residences — 108 apartments

Finbar has secured development approval for a $73 million Rivervale project expected to enter the market in FY2027.

Likely joinery requirementEarly project signal
Project
Apartment development
Published
8 Nov 2026
Closing
Not stated
Verified
8 Nov 2026

Cabinetry scopeApartment kitchens, vanities, wardrobes, laundries and amenity joinery.

Strong matchNedlands, WA

Louise Street — 16 multiple dwellings

A $15 million Nedlands apartment proposal reported as approved, with the professional team still unidentified.

Likely joinery requirementEarly project signal
Project
Three-storey apartment development
Published
26 Aug 2026
Closing
Not stated
Verified
8 Nov 2026

Cabinetry scopeApartment kitchens, vanities, wardrobes, laundries and storage.

Strong matchInnaloo, WA

Innaloo Apartments

Solaris lists an 18-apartment development expected to commence in Q4 2026.

Likely joinery requirementUpcoming packageBuilder appointed
Project
18 architect-designed apartments
Published
6 Nov 2026
Closing
Not stated
Verified
6 Nov 2026

Cabinetry scopeRepeated kitchens, vanities, robes, laundries and storage.

Strong matchInnaloo, WA

Twyford Townhouses

Five architect-designed, two-storey townhouses remain listed as coming soon by Solaris.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Five boutique townhouses
Published
6 Nov 2026
Closing
Not stated
Verified
6 Nov 2026

Cabinetry scopeFive kitchens, vanities, wardrobes, laundries and built-in storage.

Strong matchHarrisdale, WA

Harrisdale Residence

A $1.7m bespoke French château-inspired residence listed as coming soon by Solaris.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Bespoke two-storey custom home
Published
6 Nov 2026
Closing
Not stated
Verified
6 Nov 2026

Cabinetry scopePremium kitchen, pantry, vanities, wardrobes, laundry and feature built-ins.

Strong matchArdross, WA

Ardross Residence

Solaris lists a $1.2m contemporary custom home as coming soon.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Contemporary two-storey custom home
Published
6 Nov 2026
Closing
Not stated
Verified
6 Nov 2026

Cabinetry scopeKitchen, pantry, vanities, wardrobes, laundry and living-area built-ins.

Strong matchNorth Fremantle, WA

Verse on McCabe

Thomas Building was appointed for Mustera's 42-apartment North Fremantle development while documentation and procurement progressed.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Eight-storey, 42-apartment development
Published
6 Nov 2026
Closing
Not stated
Verified
6 Nov 2026

Cabinetry scopeApartment kitchens, vanities, robes, laundries, storage and communal-area joinery.

Strong matchAttadale, WA

Attadale Residence

Contemporary river-view custom residence publicly listed as coming soon by Solaris.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Two-storey custom residence
Published
6 Nov 2026
Closing
Not stated
Verified
6 Nov 2026

Cabinetry scopeKitchen, vanities, wardrobes, laundry, entertainment and storage joinery.

Strong matchSouth Perth, WA

Nine apartments — South Perth Esplanade

Nine-dwelling, $25 million riverfront apartment proposal remaining under assessment.

Likely joinery requirementEarly project signal
Project
Nine multiple dwellings
Published
2 Oct 2026
Closing
Not stated
Verified
1 Nov 2026

Cabinetry scopeNine high-spec kitchens, sculleries, vanities, wardrobes, laundries and bespoke living cabinetry.

Strong matchInnaloo, WA

Solaris Innaloo residential pipeline

Builder-listed pipeline of 18 apartments and five townhouses with stated 2026 commencement targets.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Apartments and townhouses
Published
22 Oct 2026
Closing
Not stated
Verified
22 Oct 2026

Cabinetry scopeTwenty-three kitchens, vanities, wardrobes, laundries and common-area joinery.

Strong matchHamilton Hill, WA

16 Rodd Place villas, Hamilton Hill

Infill Property Group lists 22 villas as coming soon in an established Perth suburb.

Likely joinery requirementEarly project signal
Project
Villa development
Published
22 Oct 2026
Closing
Not stated
Verified
22 Oct 2026

Cabinetry scopeTwenty-two repeatable kitchens, vanities, wardrobes and laundries.

Strong matchSouth Perth, WA

Vantis Riverside Residences, South Perth

Pre-launch boutique development of 27 residences across five levels at 59 Canning Highway.

Likely joinery requirementEarly project signal
Project
Boutique apartments
Published
22 Oct 2026
Closing
Not stated
Verified
22 Oct 2026

Cabinetry scopeTwenty-seven apartment kitchens, vanities, wardrobes and rooftop/common-area joinery.

Strong matchNedlands, WA

Umbra custom home, Nedlands

Trendsetter Homes lists Umbra, Nedlands among its custom homes scheduled for 2027.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Custom detached home
Published
22 Oct 2026
Closing
Not stated
Verified
22 Oct 2026

Cabinetry scopeBespoke kitchen, scullery, vanities, wardrobes, study and entertainment cabinetry.

Strong matchWellard, WA

The Crossings apartments, Wellard

Thirty-apartment Yaran development reported as commencing construction in March 2026 with Q1 2028 completion.

Likely joinery requirementUpcoming package
Project
Boutique apartments
Published
22 Oct 2026
Closing
Not stated
Verified
22 Oct 2026

Cabinetry scopeThirty apartment kitchens, vanities, robes and selected ground-floor storage.

Strong matchWembley, WA

Reserve Street custom home, Wembley

Equilibrium Homes identifies Reserve Street as one of three custom builds currently progressing.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Custom detached home
Published
22 Oct 2026
Closing
Not stated
Verified
22 Oct 2026

Cabinetry scopeCustom kitchen, bathroom, wardrobe, laundry and living-area joinery.

Strong matchComo, WA

Grouped dwellings — 120 Mary Street, Como

Recently lodged $6m grouped-dwelling application, with dwelling count and project team requiring confirmation.

Likely joinery requirementEarly project signal
Project
Grouped dwellings
Published
11 Sept 2026
Closing
Not stated
Verified
18 Oct 2026

Cabinetry scopeMultiple kitchens, vanities, wardrobes, laundries and built-in storage.

Strong matchBeaconsfield, WA

Nara all-electric townhouse community

Northerly is delivering the first two stages of Stockland's 206-townhouse Beaconsfield community.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Staged townhouse community
Published
12 Oct 2026
Closing
Not stated
Verified
12 Oct 2026

Cabinetry scopeHigh-volume repeated kitchens, vanities, wardrobes, laundries and townhouse upgrades.

Strong matchClaremont, WA

Shenton Road apartments

Proposed eight-storey apartment development with a declared value of $67 million.

Likely joinery requirementEarly project signal
Project
Eight-storey multiple-dwelling development
Published
11 Sept 2026
Closing
Not stated
Verified
12 Oct 2026

Cabinetry scopeApartment kitchens, vanities, wardrobes, laundries, common areas and amenity joinery.

Strong matchComo, WA

Leonora Street grouped dwellings

Current $18 million grouped-dwelling proposal across three Como properties.

Likely joinery requirementEarly project signal
Project
Grouped dwellings
Published
11 Sept 2026
Closing
Not stated
Verified
12 Oct 2026

Cabinetry scopeMultiple kitchens, sculleries, vanities, wardrobes, laundries and built-ins.

Strong matchEast Fremantle, WA

East Fremantle nine-terrace development

Nine two- and three-level terrace houses with basement parking proposed across the Canning Highway and St Peters Road site.

Likely joinery requirementEarly project signal
Project
Nine terrace houses with basement parking
Published
7 Sept 2026
Closing
Not stated
Verified
11 Oct 2026

Cabinetry scopeNine kitchens, vanities, robes, laundries and multi-level built-in storage.

Strong matchNedlands, WA

38 Portland Street apartment amendment

Approved Form 2 amendment associated with a ten-dwelling apartment development in Nedlands.

Likely joinery requirementEarly project signal
Project
Ten multiple dwellings
Published
11 Oct 2026
Closing
Not stated
Verified
11 Oct 2026

Cabinetry scopeTen kitchens, vanities, wardrobes, laundries and apartment storage.

Strong matchNorth Coogee, WA

Sixty-one apartments, Orsino Boulevard

A $20 million North Coogee mixed-use project has a Form 2 DAP meeting scheduled for 7 October 2026.

Likely joinery requirementEarly project signal
Project
Mixed-use development with 61 apartments and one commercial tenancy
Published
2 Oct 2026
Closing
Not stated
Verified
2 Oct 2026

Cabinetry scopeApartment kitchens, vanities, wardrobes, laundries, common areas and commercial-tenancy joinery.

Strong matchMosman Park, WA

Two-storey dwelling and pool, Bryant Avenue

Fresh custom-home application in Mosman Park, open for consultation until 8 October 2026.

Likely joinery requirementEarly project signalDocuments available
Project
Custom detached dwelling with pool
Published
2 Oct 2026
Closing
Not stated
Verified
2 Oct 2026

Cabinetry scopeKitchen, pantry, vanities, wardrobes, laundry and bespoke built-ins.

Low confidenceEast Fremantle, WA

East Street social apartments

Approved 34-apartment East Fremantle project targeting a Q4 2026 construction start.

Likely joinery requirementEarly project signal
Project
Thirty-four social apartments
Published
27 Sept 2026
Closing
Not stated
Verified
27 Sept 2026

Cabinetry scopeCompact kitchens, vanities, wardrobes, laundries and accessible joinery.

Strong matchCanning Vale, WA

Tulloch Way social and affordable housing

ABN Residential was appointed in August 2026 to deliver 50 homes in Canning Vale.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Social and affordable grouped housing
Published
13 Sept 2026
Closing
Not stated
Verified
22 Sept 2026

Cabinetry scopeKitchens, bathroom vanities, wardrobes, laundries and accessible cabinetry across 50 homes.

Strong matchCottesloe, WA

Eight apartments and private garden, Salvado Street

Eight premium apartments approved in August 2026 with Kerry Hill Architects and developer-side representatives identified.

Likely joinery requirementEarly project signalDocuments available
Project
Boutique coastal apartments
Published
19 Aug 2026
Closing
Not stated
Verified
17 Sept 2026

Cabinetry scopePremium kitchens, vanities, wardrobes, laundries and architectural built-ins.

Strong matchBaynton, WA

Baynton residential complex

City-owned $26.2 million development of 17 townhouses and 20 low-rise apartments with Acero Construction appointed.

Likely joinery requirementEarly project signalBuilder appointed
Project
Townhouses and low-rise apartments
Published
17 Sept 2026
Closing
Not stated
Verified
17 Sept 2026

Cabinetry scopeThirty-seven kitchens plus vanities, wardrobes and townhouse laundries.

Strong matchTuart Hill, WA

Tuart Hill six-apartment proposal

Small apartment project scheduled for a DAP decision meeting on 22 September 2026.

Likely joinery requirementEarly project signal
Project
Six multiple dwellings
Published
17 Sept 2026
Closing
Not stated
Verified
17 Sept 2026

Cabinetry scopeSix kitchens, vanities, robes, laundries and communal cabinetry.

Strong matchBusselton, WA

Busselton community housing development

Thirty-dwelling project approved in June 2026 with Housing Choices WA appointed to construct, own and operate it.

Likely joinery requirementEarly project signal
Project
Thirty-dwelling community housing
Published
17 Sept 2026
Closing
Not stated
Verified
17 Sept 2026

Cabinetry scopeThirty repeat kitchens, vanities, wardrobes and accessible-storage elements.

Strong matchEast Fremantle, WA

East Fremantle community apartments

Foundation Housing has been selected to deliver 34 one- and two-bedroom social apartments.

Likely joinery requirementEarly project signal
Project
Thirty-four community apartments
Published
17 Sept 2026
Closing
Not stated
Verified
17 Sept 2026

Cabinetry scopeThirty-four compact kitchens, vanities, wardrobes and accessible storage.

Strong matchCottesloe, WA

Station Street residential and hotel precinct

Multiplex is appointed for Sirona Urban's major Cottesloe development, with construction anticipated late 2026.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Mixed-use apartment, hotel and retail precinct
Published
21 Aug 2026
Closing
Not stated
Verified
13 Sept 2026

Cabinetry scopeApartment kitchens and robes, hotel casework, reception joinery and commercial fit-out cabinetry.

Strong matchCottesloe, WA

2 Gadsdon Street three-unit renovation

Council-hosted building-permit drawings cover renovations to three Cottesloe units.

Likely joinery requirementEarly project signalDocuments available
Project
Three-unit residential renovation
Published
13 Sept 2026
Closing
Not stated
Verified
13 Sept 2026

Cabinetry scopeRenovated kitchens, bathrooms, wardrobes and other unit-specific cabinetry.

Strong matchDalkeith, WA

Luxury townhomes, Dalkeith

Five boutique townhouses are listed by Westbridge Urban as under construction.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Five luxury townhouses
Published
13 Sept 2026
Closing
Not stated
Verified
13 Sept 2026

Cabinetry scopePremium kitchens, sculleries, vanities, wardrobes, laundries and bespoke built-ins.

Strong matchComo, WA

Como Terrace townhomes

Eleven modern townhomes beside Neil McDougall Park are listed as under construction.

Likely joinery requirementUpcoming packageBuilder appointed
Project
Eleven townhouses
Published
13 Sept 2026
Closing
Not stated
Verified
13 Sept 2026

Cabinetry scopeKitchens, pantries, vanities, wardrobes, laundries and living-room built-ins.

States
Work mix
Project categories
Opportunity classes