Opportunity summary
Explicit joinery package, established builder and partial-scope submissions may suit capable medium joiners.
- Stage
- Head contractor appointed; supply-chain EOI open · Formal tender
- Cabinetry scope
- Carpentry and joinery across accommodation, education, allied-health and industry buildings; package boundaries are unpublished.
- ICN lists Carpentry and joinery as an open work package.
- Full and partial scope EOIs are accepted.
- The displayed closing date is 15 October 2026 ACST.
- Sitzler is the appointed design-and-construct contractor.
- The awarded head contract is valued at $238.5 million.
- The project includes 480 beds and supporting buildings.
- Partial-scope submissions may permit specialist cabinetry bids.
- Substantial fixed joinery is likely, but detailed schedules are unavailable publicly.
These are reasoned inferences, not statements from the issuing organisation.
- What cabinetry items are included?
- What security clearances are mandatory?
- What is the exact closing time?
- Are minimum turnover requirements imposed?
Evidence
Open packageCarpentry and joinery — Full Scope EOI — Open.
Gateway by ICN · checked 6 Oct 2026
Partial scopeExpress either full or partial scope interest.
Gateway by ICN · checked 6 Oct 2026
Closing dateCloses: 15 Oct 2026 (ACST).
Gateway by ICN · checked 6 Oct 2026
Builder and valueSitzler was awarded a $238.5 million design-and-construct contract.
Office of Major Infrastructure Delivery · checked 6 Oct 2026
LocationThe expansion is at Acacia Prison in Wooroloo.
Government of Western Australia · checked 6 Oct 2026
Package detailsThe public notice does not provide detailed joinery schedules or eligibility requirements.
Gateway by ICN · checked 6 Oct 2026