Skip to main content
JOINA
Likely joinery requirementUpcoming packageBuilder appointed

Burswood Point River Homes

Staged collection of luxury four-bedroom riverfront homes under construction with Urbane.

Opportunity summary

Multiple high-value homes combine substantial per-dwelling cabinetry with a publicly identifiable boutique builder.

Stage
Stage 1 structure progressing; Stage 2 concrete works commenced · Upcoming package
Cabinetry scope
Luxury kitchens, walk-in sculleries, wardrobes, dual vanities, bars, wine storage and entertainment cabinetry.
What is confirmed
  • Urbane is the appointed River Homes builder.
  • Homes have four bedrooms and two or three storeys.
  • DKO Architecture designed the three-storey selection.
  • Stage 2 concrete works had commenced by July 2026.
  • Published specifications include sculleries, robes and dual vanities.
JOINA assessment
  • Stage 2 joinery may not yet be installed or fully bought out.
  • A consistent product range may allow repeatable production.
  • The luxury specification favours architectural joinery capability.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Which stages still lack an appointed joiner?
  • Does Urbane procure cabinetry centrally or by dwelling batch?
  • Are Gaggenau integration samples required?

Evidence

Builder

Urbane is identified as the builder for the River Homes.

Urbane · checked 28 Aug 2026
Residential specification

Four-bedroom homes include sculleries, multiple living areas, robes and dual vanities.

Burswood Point · checked 28 Aug 2026
Construction status

The River Homes are under construction at Burswood Point.

Burswood Point · checked 28 Aug 2026
Package timing

Recent Stage 2 structural commencement suggests downstream cabinetry may still be upcoming.

Burswood Point News · checked 28 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Golden Sedayu