Edward Street grouped dwellings

Six grouped dwellings in inner Perth entered the DAP process on 7 August 2026 with a declared $3.6 million cost.

Opportunity summary

Compact six-dwelling scale and moderate project value align with small-medium production joiners.

Stage
DAP application under assessment · Early project signal
Cabinetry scope
Six kitchens, vanities, wardrobes, laundries and residential storage packages.
What is confirmed
  • The application proposes six grouped dwellings.
  • Application received 7 August 2026.
  • Declared development cost is $3.6 million.
  • The site covers 79 and 81 Edward Street.
JOINA assessment
  • The project should provide repeat residential cabinetry without high-rise logistics.
  • Project-team research is required before outreach.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Who are the applicant and architect?
  • Has the development been advertised locally?
  • Is a builder involved in design development?

Evidence

Residential scope

The DAP report records six grouped dwellings at 79-81 Edward Street.

Current DAP Applications, 31 August 2026 · checked 6 Sept 2026
Value

The declared development cost is $3.6 million.

Current DAP Applications, 31 August 2026 · checked 6 Sept 2026
Recency

The application was received on 7 August 2026.

Current DAP Applications, 31 August 2026 · checked 6 Sept 2026
Joinery potential

Six dwellings imply a manageable repeat cabinetry package for a local joiner.

Analyst inference from residential scope · checked 6 Sept 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Government of Western Australia