Skip to main content
JOINA
Likely joinery requirementEarly project signalDocuments available

Eight-apartment residential development, Cottesloe

Two-storey, eight-dwelling coastal project with public plans and a scheduled DAP meeting.

Opportunity summary

Only eight dwellings in a premium coastal suburb, with architectural plans already prepared.

Stage
Under assessment; DAP meeting scheduled 9 September 2026 · Early project signal
Cabinetry scope
Kitchens, bathroom vanities, wardrobes, laundries, storage and common-area cabinetry.
What is confirmed
  • DAP/26/03091 proposes eight multiple dwellings.
  • The design is two storeys with undercroft parking.
  • A separate private garden and amenity lot is proposed.
  • Recorded development cost is $10.48 million.
  • The application was received on 14 April 2026.
  • DAP consideration is scheduled for 9 September 2026.
JOINA assessment
  • The cost per dwelling suggests a relatively high specification.
  • Public architectural drawings should identify the design team.
  • Joinery pricing may follow approval and detailed design.

These are reasoned inferences, not statements from the issuing organisation.

Confirm before contacting
  • Who are the architect and developer?
  • Has a preferred builder been engaged?
  • Will cabinetry be one package or apartment-by-apartment?
  • What approval recommendation will be issued?

Evidence

Scale

The proposal comprises eight dwellings over two storeys with undercroft parking.

Town of Cottesloe · checked 23 Aug 2026
Documentation

Applicant, architectural, landscape, transport and planning documents are listed.

Town of Cottesloe · checked 23 Aug 2026
Value and meeting

The DAP register records $10.48 million and a 9 September meeting.

WA Development Assessment Panels · checked 23 Aug 2026
Joinery scale

Eight complete dwellings provide a coherent package suited to a specialist residential joiner.

Town of Cottesloe · checked 23 Aug 2026

Check before acting

JOINA provides a concise original summary of public information. Confirm dates, eligibility, scope, documents and submission requirements with the issuing organisation. JOINA does not represent that an early project signal is accepting quotations.

Attribution: Town of Cottesloe