Opportunity summary
Compact inner-city infill scale aligns with a small-to-medium residential joiner.
- Stage
- DAP application under assessment · Early project signal
- Cabinetry scope
- Six kitchens, laundries, vanities, wardrobes and living-area cabinetry.
- DAP/26/03167 proposes six grouped dwellings.
- The stated development cost is $3.6 million.
- The application was received on 7 August 2026.
- The per-dwelling value suggests scope for better-than-basic internal finishes.
- Joinery procurement is probably downstream of planning and builder selection.
These are reasoned inferences, not statements from the issuing organisation.
- Who is the project applicant?
- Is an architect or builder appointed?
- Are the dwellings intended for individual sale?
Evidence
Project scaleThe register records six grouped dwellings with a $3.6m development cost.
WA Development Assessment Panels · checked 2 Sept 2026
Recent lodgementThe application was received on 7 August 2026.
WA Development Assessment Panels · checked 2 Sept 2026
Public research routeThe DAP Secretariat provides application enquiry contacts.
Department of Planning, Lands and Heritage · checked 2 Sept 2026
PostcodeAustralia Post records Perth's delivery postcode as 6000.
Australia Post · checked 2 Sept 2026
ScaleRegister records six grouped dwellings in inner Perth.
DAP Current Applications · checked 17 Sept 2026
Timing and valueReceived 7 August 2026 with a stated $3.6 million cost.
DAP Current Applications · checked 17 Sept 2026
Residential scopeThe DAP report records six grouped dwellings at 79-81 Edward Street.
Current DAP Applications, 31 August 2026 · checked 6 Sept 2026
ValueThe declared development cost is $3.6 million.
Current DAP Applications, 31 August 2026 · checked 6 Sept 2026
RecencyThe application was received on 7 August 2026.
Current DAP Applications, 31 August 2026 · checked 6 Sept 2026
Joinery potentialSix dwellings imply a manageable repeat cabinetry package for a local joiner.
Analyst inference from residential scope · checked 6 Sept 2026
ScopeThe register describes six grouped dwellings at 79 and 81 Edward Street.
WA Development Assessment Panels · checked 23 Aug 2026
Recent lodgementThe $3.6 million application was received on 7 August 2026.
WA Development Assessment Panels · checked 23 Aug 2026
Joiner fitSix residential units represent a manageable potential package, subject to design confirmation.
WA Development Assessment Panels · checked 23 Aug 2026